Agreement Between Owner And Subcontractor

b) The architect may, with the owner`s consent, omit the works presented or described in the calendar or add or vary them. A construction contract is a legal document that binds the two parties to the agreed terms. It mentions the duration of the project, the cost per square metre or per item, the building materials used, etc. The contractor is responsible for the safe conservation and conservation of all materials on site. It reimburses the owner for any loss that may result. The owner should be able to monitor the work done by the owner and require modifications based on his needs. The contractor is required to supply the goods and products in accordance with the contract. There should be communication between the owner and the contractor so that the project is carried out without any problems. 8.

The contractor is solely responsible for respect, effort, responsibility, etc. Because of the following issues, under the relevant laws, the law and the owner is not liable for this compliance, costs, liability and damages in all circumstances. The terms of the agreement between the owner and the contractor include work to be worked, construction time, payment plans, escalating costs, delays, penalties, construction materials used, etc.1. The contractor undertakes to provide all the materials and work necessary to carry out the following work: [Describe the work to be carried out] as indicated in the drawing or designs and described in the specifications established by the owner, which are marked by the signatures of the parties to this agreement. 15. Legal and legal fees are paid by the defendant in the event that the decision to enforce the agreement or a violation of the agreement is to be and will be obtained. Before handing over the building to the owner, the maintenance time must be specified in the contract. In most cases, the maintenance period is from six months to one year. If you want to start work immediately, you can accept an interim agreement. You should mention in the agreement that the interim contract is in effect until a permanent contract is signed between the owner and the contractor. 3. The term architect is architect — (architect`s name and company information) with office address at #____ (the architecture office`s address) and their representatives appointed by the owner and, If he is hired, be the architect designated by the owner and the other in writing.